Posted in Completed Projects, Knit Ramblings, Life

Two FO’s and 2010 Year End Wrap Up

This New Year’s Eve definitely hasn’t gone as expected, but I think that it’s turning out to be a good one anyhow! We originally had plans to go hang out with Matt’s friend just outside of Louisville, KY. He had been having some issues with the network at his work which ultimately lead to a part being shipped early this afternoon, arriving this evening, and currently being installed so that everything is up and running by Monday. I’m bummed that we aren’t able to make it, but Matt is a rock star at his job and has to play Super IT Guy instead. Just life how life goes sometimes!

Much to my surprise, I was able to get two more projects done just before the end of the year.

The first thing I finished was the Picot Edge Hat. I saw this on Grmperina’s blog earlier this week and knew immediately I needed to make it. I’ve been trying to figure out just the right project for this yarn and I finally found it!

Picot Edge Hat (Front)
Picot Edge Hat

Pattern: Picot Edge Hat (My Ravelry project page.)
Started: December 28, 2010
Completed: December 31, 2010
Yarn: Squoosh Fiber Arts Merinio Cashmere Sport, colorway Seaside, approx 3/4 of a skein
Needles: US 4 bamboo circular and DPNs
Notes: No modifications. Followed the pattern for the medium size, though I think my gauge was a bit off. Love the way it fits and it comes over my ears and is just what I need for winter.

Picot Edge Hat (Side)
Picot Edge Hat – Side

Craig, who runs Great Northern Yarns, was kind enough to offer to send me a skein of the mink/cashmere DK yarn that I need. I thanked him repeatedly, but I am just so blown away by his kind offer! The fiber community is such a great one and I’m so happy that I get to be a part of it. 🙂

The yarn arrived today and in a short amount of time I had my Juneberry Triangle finished! I didn’t think I’d get this one done before the end of the year. I’m glad I was able to, though. It’s officially off the needles and currently blocking. I’m waiting to do the full FO post once it’s dry and I have more pictures of it, but here’s a little peek!

Juneberry
Juneberry Triangle

It’s that time of year again! Time to recap the projects I’ve completed this year. I have less projects then I did last year, but last year I had a month off work after having surgery to do all the knitting I wanted and I did smaller projects last year compared to this year.

Project breakdown for 2010:

– Eight pairs of socks
– Seven sweaters (which includes the baby sweater I knit)
– Six hats
– Five shawls
– Three scarves
– Two pairs of fingerless gloves
– One iPhone cober
– One chicken bag
– One toy alien
– One pair of baby booties
– One tree

Completed Projects in 2010
Projects Completed in 2010

Overall, I’m happy with the projects I’ve completed this year. Less then last year, but last year I had a whole month of recovery after having surgery that I spent knitting. I knit more sweaters and more shawls, but less socks. The things I like to work on are always changing and I notice it most when I do this review each year!

I had a few goals for this year. I have to make a confession… I kinda forgot about those completely! I met my goal of knitting five shawls this year, just barely. I decided I didn’t want to knit Little Birds, so I didn’t meet that goal. I didn’t get around to the exercising goal until late in the year (around September), so there’s another miss. Eat Clean diet was a miss as well (life, it gets in the way!). I think my goal of “knitting with more luxury fibers” was a bit lofty, but I think I did alright there with my sea silk shawl, my mink cashmere shawl, and my Bugga sweater. I’m sure I could have met some of these better had I not forgot about them. I guess I just wasn’t as committed as I thought I was!

For the new year I have some knitting specific goals and some other ones, but I’ll share that in the new year. 🙂

2010 has been pretty good overall. There were a few down spots, like my dear beta fish, Fred, passing away (who I had for 5 years and was a surprisingly attentive, playful and a fish with his own personality), but life is pretty good. I know that some of my friends have had a rough year and I hope that 2011 brings better things for everyone.

Happy New Year!! May the new year be great for all! 🙂

Posted in Completed Projects, Current Projects

Little Christmas Tree Decorated, Juneberry Woes

Hope everyone’s weekend was good and all the holiday gatherings and things weren’t too stressful. We had a good Christmas. My family came over for a while, we opened gifts, and we had a nice lunch. After that, we went with Matt’s dad and brother to see Tron in IMAX 3D. We both thought it was really good and I was surprised the 3D part of it didn’t bother me at all. I did take some Dramamine right before going (though you’re supposed to take in an hour before), but I think it was less like Avatar was with all the fast movement and in your face 3D scenes. Good weekend over all, I think. 🙂

Over the weekend I put the finishing touches on the little tree I shared last time. Ended up not decorating it much, but I’m pleased with how it turned out!

Little Christmas Tree
Little Christmas Tree

Pattern: Wooly Tree Tutorial (My Ravelry project page.)
Started: December 12, 2010
Completed: December 13, 2010
Yarn: Red Heart Soft Yarn in Guacamole, approx 1/3 of a skein
Needles: 4.0 mm (G) hook
Notes: I initially did the leaves every round, but when I realized I was going to run out of yarn and that I read the pattern wrong, I did the leaves every other row . I was going to decorate it with tiny ornaments. I searched and came up empty on tiny ornaments that I liked, so I decided to just put the star I found on top and call it done. Maybe next Christmas I’ll find some tiny ornaments that I like for it!

The sad news part of this weekend and this post has to do with the Juneberry Triangle I’ve been working on non-stop since I started it. I was doing quite well with the edging. Here it is just before I hit the halfway point of the edging.

Juneberry - On to the edging!
Juneberry – Edging

It was looking like I’d have enough yarn, but I knew I might be cutting it close. I got to this point when I realized the fate of my shawl.

Crap! Out of yarn :(
Juneberry – Uh oh…

Yep. Ran out of yarn. I have 8 rows left to finish the shawl and I have run out of yarn. 😦 No way am I going to rip out all that edging to rip back a row or two from the last rows before the edging to have enough yarn to finish it, though I will admit the thought did cross my mind. I really don’t want to buy a whole new skein of yarn just for the few yards I need to finish this shawl. (The yarn I’m using is Great Northern Yarns 70% Mink/30% Cashmere DK in Natural.)

In hopes that I don’t have to go that route, I’ve posted on Ravelry a few places and PM’d a few folks with partial skeins listed in their stash to see if someone would be able to help me out. I did get someone who may have some left after finishing a project and another who will check when they get home tonight, so I’m hopeful that I’ll get the little bit I need to finish this project. I was really hoping I’d be able to finish this before 2011, but that doesn’t seem to be in the cards. Ah well. That’s what happens when you know you’re going to be cutting it close!

Since this won’t be in my “FO’s of 2010” after all, I’ll be working on getting my project recap for 2010 done sometime this week and hopefully posted before the end of the year. While I wait on a resolution to finishing Juneberry, I’ll be working along on my pink and purple striped sock.

To those that are snowed in today, stay safe and don’t go out if you don’t have to! To those only wishing they had a snow day from work (like me, but only a little since I wouldn’t be looking forward to the digging out after), hope your Monday’s been a good one. 🙂

Posted in Completed Projects, Cooking, Current Projects, Sewing

OppAtt Socks, Little Christmas Tree, and Juneberry

It’s a week from Christmas and this year I have zero “must finish this by December 25th” things on my needles. It’s kind of nice, though it’s a little sad, too. I didn’t knit anyone a thing for Christmas. Last year, I knit things for 3 family members, but this year nothing really jumped out as me as things I should knit for so-and-so. I didn’t feel stressed about last year’s gift knitting since I started pretty early, so it wasn’t even that holding me back. I looked and looked at patterns. Thought about what those I’m giving gifts to might like from me (handknit or otherwise). The one thing I really kept coming back to is this: I don’t get asked for handknits from people I would knit for. That makes it hard to think of things they might like that I could knit and they’re all a bit difficult to buy gifts for (I realize I’m hard to buy gifts for, too). Ultimately I concluded that store-bought gifts would be what I would be giving this year.

So… that means I’ve been knitting merrily away on some things for myself since I last posted! I even finished two things.

First thing I finished was the Opposites Attract Mystery KAL Socks. Didn’t take me long to finish the socks after I finished the commissioned knits I did.

Side note about that: everything worked out well. I think it was a misunderstanding on my part about price or maybe I misheard what was said, but regardless, things turned out well. I have been thanked repeatedly and was told many times over that they knew they were getting a huge discount and the items are “worth hundreds!” I feel a bit bad for complaining and getting worked up about it. I’m just relieved that it all worked out well in the end and wasn’t as uncomfortable as I thought it might be.

Anyhow, back to the socks! I like how they turned out and I’m very pleased with the fit. I don’t often do mystery sock KALs and usually end up frogging them. This one kept my interest and as the design came out one clue at a time, I continued to like the pattern and kept on knitting.

OA Mystery Socks
Opposites Attract Mystery KAL Socks

Pattern: OppAtt Mystery KAL for Barking Dog Yarns by Jeannie Cartmel (My Ravelry project page.)
Started: November 3, 2010
Completed: December 12, 2010
Yarn: Barking Dog Opposites Attract, colorway George & Gracie, one skein
Needles: US 1 (2.25 mm) Knit Picks circular
Notes: No modifications to the pattern, knit as written for the 72 stitch sock.

OA Mystery Socks (Front)
Opposites Attract Mystery KAL Socks – Front

OA Mystery Socks (Back)
Opposites Attract Mystery KAL Socks – Back

The other item I finished was a little crocheted Christmas tree. It was pretty simple to do, though it did take some fiddling to get the leaves how I liked them due to me misreading part of the tutorial. Took just a little more then a day to finish. I still need to add ornaments to it, so I’m not calling it completely finished yet. Once I add ornaments, I’ll do an FO post for it. The tutorial for it can be found here.

Crochet Christmas Tree
Little Christmas Tree

A few posts ago, I mentioned wanting to crochet the Boteh Scarf. After finishing the Opposite Attract socks, I immediately started this, then lost a bit of interest when the I found the tree pattern above. It’s a pretty easy pattern and the first scarf I’ve ever attempted crocheting. It’s even helping me get the hang of crochet charts a bit. Not completely, but it is at least making some sense for a change. The yarn I’m using is Bigmouth Yarns Buxom Sock in “You’re Turning Violet, Violet!”

Boteh Scarf
Boteh Scarf

Around the same time that I started the scarf and crochet the tree, Sairy posted about buying yarn for the Juneberry Triangle, which I immediately went to queue and realized I already had! Suddenly I needed to knit it NOW, so I looked through my stash and found that the DK weight mink/cashmere yarn I bought from Great Northern Yarns a while ago had enough yardage and would work for the shawl. Didn’t take long before I had cast on and found myself not working on any other projects.

Juneberry
Juneberry Triangle

Juneberry
Juneberry Triangle – Close

I’m now halfway through chart D, which is the one with bobbles. I rarely pick projects that have bobbles, but I have no real reason for that or aversion to them. Just haven’t really knit many things with them. I was actually surprised to realize there were bobbles in the pattern. I either didn’t pay enough attention to the photos of the shawl or just chose to ignore the fact that they were there. I find them to be a bit fiddly and they usually don’t appeal to me in a pattern. I will say that being able to knit backwards really comes in handy when knitting bobbles. None of that turn, turn, turn stuff, which got on my nerves after the first row with bobbles. I can only do the knit stitch well backwards, but I am very thankful I learned that when I took my first knitting class at Knitter’s Connection a few years ago.

I’m hoping to do a year end wrap up post like I have the last two years with all my FO’s, though I’ll likely wait until after Christmas to do that to see if I can sneak in another FO before the year is out. In preparation, I’ve been browsing through some old posts, looking at the projects I’ve completed this year, and even re-reading the goals I set for myself at the beginning of this year. If I don’t get a chance to post again before Christmas, I hope everyone has a lovely holiday! 🙂

Posted in Completed Projects, Current Projects

Finishing Things, Starting Things

December has arrived and so has the cold weather! Not so bad of a thing when you’re a knitter, though. Been getting out the scarves and mittens to keep me warm this week. Since my last post, I’ve finished two things.

First thing I finished was the Mystery KAL hat from Woolly Wormhead. Didn’t take long since I was so close to being done. I made this my Thanksgiving Day knitting since it took less concentration then the baby sweater I was working on.

Limpetiole (Brim)
Limpetiole

Pattern: Limpetiole aka Woolly Wormhead Mystery KAL Hat B (My Ravelry project page.)
Started: November 1, 2010
Completed: November 25, 2010
Yarn: Elsebeth Lavold Silky Wool in color 81, one skein
Needles: US 6 bamboo circular and DPNs
Notes: No mods, followed pattern as written. Well written pattern that makes a lovely hat.

Limpetiole (Top)
Limpetiole

Here’s the thing about hats/berets and me: I don’t really wear them. I don’t know why I keep insisting on knitting yet another hat I end up feeling like I look stupid in. Might be time to either quit it or knit them with an intended recipient in mind. For now I’ll stash this in the “maybe I’ll give this away” pile (which isn’t really as big as my saying this might make it out to be).

The second FO I have to share is something I’m very happy to have done. I swear this felt like it took a lot longer then it did! At least it is done, I’m happy with how it turned out, it will be given to the person who requested I knit it early next week since it is currently drying, and I can get back to the other projects that I put on hold so I could work on this.

Trellis
Trellis

Pattern: Trellis (My Ravelry project page.)
Started: November 22, 2010
Completed: December 6, 2010
Yarn: Plymouth Dreambaby DK in brown, 2.5 skiens
Needles: US 6 bamboo straight needles
Notes: I found this pattern to be a bit fiddly and complicated for a baby sweater. Definitely not for someone who doesn’t like seaming. This sweater felt like it too a lot longer then 2 weeks to knit… I swear it felt like it took a month. I’m sure it didn’t help that I was kind of over the excitement of a new project (I’d never knit a baby sweater prior to this) shortly after starting! Mostly knit as written. I did change how the collar was worked. I worked it as a knit on boarder rather then having to knit it and sew it down. For right side collar: on right side row, work in seed stitch to 1 stitch from end, slip last stitch, pick up one stitch from edge, work as ssk. Work wrong side row in pattern. Repeat until the border is at the middle back of the neck. For left side collar: on wrong side row, work in seed stitch to 1 stitch from end, slip last stitch, pick up one stitch from edge, work as ssk. Work right side row in pattern. Repeat until the border is at the middle back of the neck.

Trellis
Trellis

As soon as I had the last button sewn on Trellis, I started a new stripy sock. I received this not too long ago and couldn’t wait to start a sock with it. The yarn is Perfect Day Yarns self-striping in the “Shew Woos Me” colorway. The picture below doesn’t do it justice, since I took it with my iPhone, but it’s really beautiful and I’m really enjoying knitting with this yarn. My stash definitely needs more of Sarah’s yarns! 😀

PDY Stripey Sock
Perfect Day Yarns Stripey Sock

I’m still working on my Opposites Attract Mystery Socks. Close to being done with both! Finished up clue 3 and now working on the last clue. Currently trying to figure out what to work on finishing up after those are done, but right now just enjoying knitting on the OA and Stripey socks.

Now it’s off to the gym with Matt to get our butts kicked by our personal trainer. It’s been about a month since our last appointment, so I have a feeling I’m going to be sore tomorrow! In a good way, of course. 😉